02-16-2014, 04:27 PM
The next two pics show the east end of the plant. Here I will add a dropdown section that will hinge out of the way when not in use. But that is a latter project. I will need this as the turnouts to the west are out of reach from the front of the layout making single person operation difficult. with a second operator this is not a problem. You can see where the double track main ends at the edge of the layout, That is a roll out section Called Saylor's junction. The second operator would be on the other side of it. He, "or she", is only really needed when a train is entering or leaving the plant from the branch that connects to the main in Bath.
I have also started on the Head house of the bag and bulk loading building.
I have also added the office that is on the end of the silos.
I have also started on the Head house of the bag and bulk loading building.
I have also added the office that is on the end of the silos.
My other car is a locomotive, ARHS restoration crew
