02-18-2014, 09:53 AM
BR60103 Wrote:Remind me not to have coffee when I visit you.Don't worry, the tiny aluminum bits will be invisible in strong German coffee
The components of the long narrow scrap yard have been compiled and put together.
1. Trucks deliver the aluminum scrap. It is stored on piles.
2. It is moved with a belt conveyor
3. into the press to get scrap bails
4. The bails are temporary stored and finally loaded into gondolas at the loading area. Sometimes is other kind of scrap direct delivered to the loading area like in the last gondola. The excavator with the gripper loads the conveyor (2.) too when new material needs to be pressed in bails.
Next is integration into the ground, weathering (the excavator cries for dirt ) and details
Reinhard