02-25-2009, 12:59 AM
Made a couple small changes. I added a track to serve the Armstrong Electric Motors building. I had to add in another crossing and take out the small siding at the top right to do this, added a Atlas Code 83 30 degree crossing. I also added another small siding to make up for removing the other on the left across the mainline from the other thats already there
![[Image: e4d2e584.png]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Highway%20And%20Switching%20Layout/e4d2e584.png)
All other stuff is the same as it was on my last post. I think im done editing this plan and now its just a matter of getting the track to do it
![[Image: e4d2e584.png]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Highway%20And%20Switching%20Layout/e4d2e584.png)
- 1. Blue Star Ready Mix Concrete Batch Plant
2. Blue Star Ready Mix's Bulk Materials Unloader Conveyor/Pit
3. Blue Star Ready Mix's Bulk Materials Bunkers
4. Blue Star Ready Mix Asphalt Batch Plant (not drawn in)
5. Ramp/Bridge from Washington Street Bridge
6. Washington Street Bridge
7. Highway On-Ramp from Washington Street to Highway 10
8. Highway 10 (not drawn in, 6 lane highway with center divider)
9. Centennial Mills (Rail and or Truck Loading Dock)
10. Armstrong Electric Motors (Truck Loading Dock Space)
11. Un-Known Company (Rail Access and 3 Truck Docks
12. Un-Known Company (4 Rail Access Doors, 2 Truck Docks)
13. Atlas Code 83 19 Degree Crossing
14. Atlas Code 83 30 Degree Crossing
15. Walthers Code 83 #6-1/2 Curved Turnout
All other stuff is the same as it was on my last post. I think im done editing this plan and now its just a matter of getting the track to do it
