04-17-2014, 06:19 AM
All tracks and switches done, all switch machines installed and all wiring completed.
Currently testing the new track plan of Corktown at the center of the cork desert with a six axis Athearn RTR SD40-2 and some cars
![[Image: IMG_3230_zpsa00cd288.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3230_zpsa00cd288.jpg)
![[Image: IMG_3231_zps2ac76b3d.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3231_zps2ac76b3d.jpg)
Did not completely cleanup the "concrete" at one spot located under a switch now. That switch is not perfect flat and the SD40 rocks running over it.
Currently testing the new track plan of Corktown at the center of the cork desert with a six axis Athearn RTR SD40-2 and some cars
![[Image: IMG_3230_zpsa00cd288.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3230_zpsa00cd288.jpg)
![[Image: IMG_3231_zps2ac76b3d.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3231_zps2ac76b3d.jpg)
Did not completely cleanup the "concrete" at one spot located under a switch now. That switch is not perfect flat and the SD40 rocks running over it.
Reinhard
