2 X 4 Everett & Monte Cristo RR(ish) build
#15
Now that I can see the pics,

Neat track plan. Is it N or N narrow gauge? Either way looks entertaining(operations) I myself am still in the loop running phase(O-36 curves ATLAS O and Gargraves O gauge track) Still in the planning stage for an S gauge layout the O and S gauge layouts will be display layouts like the stores used to have and will be surrounded by a loop of On30. At some point I will make a portable On30 modular setup to experiment with switching and operations.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)