Shelf layout doodles - 15x1.5, 18x1.5, & 12x1.5 feet
#8
Brakie Wrote:Now that's a great designed ISL that fills the switching operation needs of most ISL builders-according to the last ISL seminar I attended.

I would call that a grown up timesaver worthy of building. Thumbsup Thumbsup

The only thing I would change would be to eliminate the switch back with a crossing if it interfered with the LPG distributor.

BTW..That manufacturing company would be a great distention for coil cars since the tracks enter the building..

It could also be done like that. Instead of staging tracks, just have them enter the building. I would just do it with one track though.

The LPG dealer doesn't interfere with the cement distributor since there would also be only one car there once or twice a week and there is still enough track to drill the cement dealer. I may also just make that the IHC ready mix plant.
Mike Kieran
Port Able Lines

" If the world were perfect, it wouldn't be " - Yogi Berra.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)