06-23-2014, 02:45 PM
Hi Andrew,
I like your plan, and choice of industries
One minor alteration you might want to consider ...
Remove the 'run-around' in switching area 2. The area is small enough that the proto railroad would probably get rid of the extra switch to save on maintenance costs, and gives you the oportunity to use a shoving platform 8-)
Out of curiosity, have you already purchased you Peco track? If not, take a look at their code 55. Same geometry, virtually the same price, and much nicer look.
Keep us posted on your progress
Cheers,
Kev
I like your plan, and choice of industries
Remove the 'run-around' in switching area 2. The area is small enough that the proto railroad would probably get rid of the extra switch to save on maintenance costs, and gives you the oportunity to use a shoving platform 8-)
Out of curiosity, have you already purchased you Peco track? If not, take a look at their code 55. Same geometry, virtually the same price, and much nicer look.
Keep us posted on your progress
Cheers,
Kev
Such is life
