08-11-2014, 12:18 PM
Well it rained last night and was still sprinkling a few moments ago so no grass cutting,
I did however mount a 3 front assault on the coaling tower/challenge, no pictures yet but may post some later.
1. I have built up a small housing structure for the clamshell bucket mechanism.
2. I have started an open tower structure for the above.
3. And I have found a small safety pin that I will make into a large railroad pad lock.
May have a pic or two by Tuesday after I make enough progress worth photographing as right now the structures do not look like much yet. the materials so far are still bits and pieces of bass and balsa wood(for those who do not know bass wood is harder than balsa which is very soft and easy to damage).
I did however mount a 3 front assault on the coaling tower/challenge, no pictures yet but may post some later.
1. I have built up a small housing structure for the clamshell bucket mechanism.
2. I have started an open tower structure for the above.
3. And I have found a small safety pin that I will make into a large railroad pad lock.
May have a pic or two by Tuesday after I make enough progress worth photographing as right now the structures do not look like much yet. the materials so far are still bits and pieces of bass and balsa wood(for those who do not know bass wood is harder than balsa which is very soft and easy to damage).