11-06-2014, 02:34 PM
[/quote]
Track is laid out and in operation and since I don't have time to do much except operate it once or twice a week, I'm still considering this a test plan for now. Have made a few structure mockups which helps to give me a feel for how the finished layout might look and must say that I enjoy operating it when I need a break from the other project. So far, I'm pretty well pleased with how it's all working out.[ATTACHMENT NOT FOUND]
[/quote]
I like this plan
Track is laid out and in operation and since I don't have time to do much except operate it once or twice a week, I'm still considering this a test plan for now. Have made a few structure mockups which helps to give me a feel for how the finished layout might look and must say that I enjoy operating it when I need a break from the other project. So far, I'm pretty well pleased with how it's all working out.[ATTACHMENT NOT FOUND]
[/quote]
I like this plan
Callum
My previous build : http://bigbluetrains.com/forum/viewtopic.php?t=4271
Video: https://www.youtube.com/watch?v=d4rqsg4x6og https://www.youtube.com/watch?v=v_gRKWo-q3A
My previous build : http://bigbluetrains.com/forum/viewtopic.php?t=4271
Video: https://www.youtube.com/watch?v=d4rqsg4x6og https://www.youtube.com/watch?v=v_gRKWo-q3A
