11-09-2014, 10:04 AM
I followed a similar approach for my warehouse district when I rebuilt my layout last winter. You see the lead track at the right side with some industry serving tracks. I had no industry planned in detail at that stage just reserved the spots and made each spot rail served.
![[Image: IMG_3231_zps2ac76b3d.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3231_zps2ac76b3d.jpg)
Modern industry parks are planned in a similar way. A web of streets two industries wide apart with a lead track in the middle. All industries have a road at the front side and a track attached to the lead track can serve the rear side of each industry.
![[Image: IMG_3231_zps2ac76b3d.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3231_zps2ac76b3d.jpg)
Modern industry parks are planned in a similar way. A web of streets two industries wide apart with a lead track in the middle. All industries have a road at the front side and a track attached to the lead track can serve the rear side of each industry.
Reinhard