The Hobo Camp Fire Is going well #VII.. Stop In!!!
The snow last week disappeared in rain and 7degreeC temperatures.
I linked up and ran a fair distance of plain track -- including my scenic grade. Took a long time to find out why it didn't work but I'd hooked up the wires to blocks 4 and 5 while I thought I'd done 5 and 6.
I had to cut expansion gaps in the track. I'd soldered the finescale rail lengths together, then we opened the hot air ducts under the layout. That produced an interesting wiggle.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.


Messages In This Thread

Forum Jump:


Users browsing this thread: 11 Guest(s)