01-13-2015, 01:24 PM
Nice plan. I would suggest trying to increase minimum radii as even though rolling stock might negotiate 18" it won't look great on exposed areas of the layout.
Are you planning manual or electrically operated turnouts? If the layout must be operated from within then some turnouts are a bit of a reach. On the same topic if you want to manually decouple then the CP scrape yard is going to be a reach and might damage scenary if those trees are going to actually be in those positions. My preference is for any decoupling to be on sidings closer to the position of operation in relation to the main.
Hope this helps,
Steve.
Are you planning manual or electrically operated turnouts? If the layout must be operated from within then some turnouts are a bit of a reach. On the same topic if you want to manually decouple then the CP scrape yard is going to be a reach and might damage scenary if those trees are going to actually be in those positions. My preference is for any decoupling to be on sidings closer to the position of operation in relation to the main.
Hope this helps,
Steve.
UK Engineering fan, from the tiny artistically engineered to the huge and powerful