02-12-2015, 05:30 AM
faraway Wrote:This is a pretty good explanation how the prototype works. The track plan could be derived from the loading and unloading operation.
http://www.trainweb.org/bedt/IndustrialL...#unloading
Hi Reinhard,
I know this diagram quite well.
That´s why I try to have space for three cars to be pulled off the float.
I am worrying about the space behind the Y-turnout, so there should be enough space to pull more then just one string of cars.
Stephan
Guys, if I don't bleed to death pretty soon, I'm gonna die of boredom.
Guys, if I don't bleed to death pretty soon, I'm gonna die of boredom.
