L&N Industrial Rail Spur
Ed,

I'm also into one of those slumps and haven't been doing much to the layout either. I usually have an operating session every third month and try to have something new done but that hasn't been happening. I have all the track and structures in place but trying to get the scenery completed has become a chore that I'm not looking forward to.
I believe we had a discussion about runarounds before and I stated had one at the Pinelands Industrial Park area on the layout. I don't use it as a around anymore, as I operate that section push-pull. It is now used as a storage track for cars to be switched at the industrial park.
Will be looking forward to your posts when your ready to resume.

Bruce
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)