03-12-2009, 08:23 PM
Quote:rbp1968
Hello of people,
and too better lastly I place you mean 20 constant ring locomotive sheds also still forwards, like the Wagenhalle am milled also the ring locomotive shed from PVC hard to plates. As turntable one is inserted of Roco.
All construction units were drawn in the turbo CAD and milled following. The locomotive shed is likewise equipped with händisch mobile gates. Further it orders over Untersuchungsgruben. The rails are eingefäst in the plates. More pictures gives it on my PAGE.
greeting
Novel
Quote:Hello of people,
Construction period (milling time) approx. 4 months (it is missing still the interior lighting).
We leave material costs beyond the 300. - Euronen, but it is worth each cent.
greeting
Novel
Quote:It would not be a problem, me already with the thoughts of the small series struck. (Initial at the beginning of 3-5 conditions alternatively with or without Unteruchungsgruben) momentary is drawn and milled everything on a track outlet of a Roco turntable (9°), however is possible for each track outlet, one would have only the roofs and the rear front the baseplates for skylight the etc.… to change. Would in principle be a reconstruction. Why not… are open for everything. All the more the more cheaply can one is needed producing and on the desires of others die.
My next project is 20 constant ring locomotive sheds of the KFJB after original plan of 1870. The track outlets and the building turntable is adapted to a Märklin. I will document these exactly also into this forum.
greeting
Novel
Amazing!
Tom
Model Conrail
PM me to get a hold of me.
Model Conrail
PM me to get a hold of me.
