Rapid Transit Modelling?
#3
The over-running third rail does pose some challenges. While kits exist to make the New York Central under-running third rail, the Over-running type might be tricky. I don't think I've seen anyone do it.

If it were me, I'd get some rail, solder metal rods/pegs to the bottom of it, and string on some beads to look like an insulator. I then mount this into the board. Not sure how I'd build the sheilds that go over it though, maybe wire brackets and styrene "boards", but this might make it a little time consuming.
Modeling New Jersey Under the Wire 1978-1979.  
[Image: logosmall.png]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)