09-28-2015, 10:59 AM
Sorry guys been awhile since I've posted anything. There was a set back but things are progressing. Went to St Louis for the RPM meet and on the long drive home was thinking about the layout and why I haven't got much done. Manly just been lazy, but also having some problems with some of the industries. So I decided to tear up half the track work and fix some of the problems.
Everman Branch 9 Model.pdf (Size: 101.38 KB / Downloads: 584)
So let the demolition begin, removed the track work that was to be changed.
Everman Branch 9 Model.pdf (Size: 101.38 KB / Downloads: 584)
So let the demolition begin, removed the track work that was to be changed.
Wayne Snyder
Creating the Ft Worth Sub - FWWR
Creating the Ft Worth Sub - FWWR
