MDC/ROUNDHOUSE locomotive rebuilds
#87
I did manage to get back at it yesterday and today:
[Image: DSCF5189_zpsdqjad2bs.jpg]
I fabricated a new set of pilot steps and added the coupler cut bar on the front of the engine. Just after I finished with the steps I found a set of original MDC ones in a box. Like the 2-8-0 old timer I used the original stantions and bent some .015 wire to make the cut off lever.
[Image: DSCF5190_zps4hv0k1q4.jpg]
I also added some grabs to the back and sides of the cab. At this point I can't go any further without painting the boiler so I sprayed it with some gray primer.
In the meantime I'm looking at some other details to be added later.
[Image: DSCF5191_zpsgsn8atao.jpg]
The CPR engine has a headlight in the center of the smokebox door with a number plate below it, as well as a second number plate at the top of the smokebox. I'll be modifying the kit headlight, removing the side number boards to make it a more prototypic.
[Image: DSCF5193_zps52wsm4io.jpg]
Stretching my soldering skills I found a brass bell and bracket in my part box that I soldered together. I already drilled the boiler to accept the mounting pin.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 8 Guest(s)