Freelance 2015-3
#78
And the next building to the right. The next right building will be omitted. I am not going to install another switch and serve the right hand via rail too. The prototype building at the right hand with the crane may be moved to the left side of the complex on my layout.

[Image: IMG_4556_zpsybk4yydh.jpg]
[Image: IMG_4555_zpsd4sgsqai.jpg]

ps. It is much more comfortable to work with water proof laser printer images than the delicate inkjet I had before.
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)