01-17-2016, 07:02 PM
Made some real headway today and completed the plumbing on the boiler along with the handrails and the last of the fire box details. This include the sand lines and valve, which proved the most difficult thing to complete.
For the fireman's side, the last of the firebox details are on including the ash pan extensions.
The Feed water heater lines are now finished, and the sand lines are complete.
More of the same for the engineers side.
For the fireman's side, the last of the firebox details are on including the ash pan extensions.
The Feed water heater lines are now finished, and the sand lines are complete.
More of the same for the engineers side.
My other car is a locomotive, ARHS restoration crew
