03-13-2016, 06:29 PM
I got a little sidetracked over the past week with some rolling stock projects.
But I did get some work done on the stamp mill:
I've slowly been gluing the walls together, clamping them at 90 degree angles as I go. I made some 1" square pieces of foam core as reinforcements for some of the joints. I have two more walls to go before I fabricate the final wall for the right fit.
But I did get some work done on the stamp mill:
I've slowly been gluing the walls together, clamping them at 90 degree angles as I go. I made some 1" square pieces of foam core as reinforcements for some of the joints. I have two more walls to go before I fabricate the final wall for the right fit.