03-20-2016, 12:50 PM
I finally got all the walls together on the stamp mill:
This is probably going to be the largest structure on my layout when its done.
and the tallest!
Now I hope that everything is square enough for the roof to be installed right (with minimal warp-age)
the final wall piece was the small one on this side. I had to wait until everything else was glued together before fabricating this one to ensure everything was more or less square. next I start adding the roof sheets.
This is probably going to be the largest structure on my layout when its done.
and the tallest!
Now I hope that everything is square enough for the roof to be installed right (with minimal warp-age)
the final wall piece was the small one on this side. I had to wait until everything else was glued together before fabricating this one to ensure everything was more or less square. next I start adding the roof sheets.