04-30-2016, 11:30 PM
Mark Williams was a retired tool and dye guy from Ford Motor Co. here in town . He utilized hundreds of pictures , determined the dimensions of the stadium from the pics and utilized design software and a laser cutter to make the thousands of pieces . Four other guys did the construction . The stadium came apart in three pieces so as to fit into the back of a truck and two of the guys drove out to California with it ( after the $$$ was collected ) and flew back . This was worth $150K .
T
T
To err is human, to blame it on somebody else shows management potential.