Dawson Creek Subdivision - British Columbia Railway - H0
Hi there,
It´s been a month since my last post. I was very busy with my work and had not so much time for the hobby. I was not so happy with the last conversion on the layout for some time. The Modules and benchwork I made for this part of the layout were not all level and I was not happy with them. So finaly I decided to remove that part for now. It was not a big deal to remove the trackwork and cork. The wood will be fired up the next winter Smile .The industries will be placed on other locations on the layout and the G.E.R.N. Industries Ltd. Facilitiy got some more tracks and has grown bigger...Here is the new trackplan. As you can see I changed the liftout at the entrance door,too. I removed the curves and have now a straight piece of track...I also started with the trackwork redo at Dawson Creek Yard. I used a shematic track diagram of the prototype for that and only removed one of the yardtracks and the spur to National Food. I added one track in front of the No.3 elevator and it will be used as teamtrack and also for loading TOFC cars.
[Image: 26831883070_d9ed2f7b64_c.jpg]
I started with the G.E.R.N. complex. The trackwork is glued down and wired. From left to right starting with the truck loading structure.There will be a background structure behind the warehose connecting it with the mill building. I´ll add a door for boxcars to that new building where the track will disapear into it.
[Image: 26428509613_034aeb63ce_c.jpg]
Mill structure with the elevator in the background. I will add an addition to the mill with an overpass to the other side of tracks next to the elevator. There will be also some pipes etc. going over the tracks to the mill.
[Image: 26998688876_cac5a65ba8_c.jpg]
[Image: 26998700646_2369abcb57_c.jpg]
Diamond Fertilizer on the right side to the front (blue and beige structures with the silo) is one of the railserved customers from the old part of the layout.
[Image: 27031991325_c723fd1fbe_c.jpg]
[Image: 27031982815_43720976d0_c.jpg]
[Image: 27031984275_ed670d40e9_c.jpg]

I also have some first pictures of the new arranged Dawson Creek yard.First pictures entering the yard from the east coming back from the G.E.R.N. area around the next corner
[Image: 26572028410_d74738c009_c.jpg]

From right to left or front to backdrop are mainline, two yardtracks, runaround and elevator track
[Image: 26572011530_0253c770d4_c.jpg]

Looking from the other direction with the station and freighthouse in the far distance
[Image: 26810671606_a60edd1b8b_c.jpg]

More pictures will follow as soon as I could do some more work on the yard. I hope to get the Industry area with G.E.R.N. finishe d by the end of the week with painting the backdrop and adding some cork as a baselayer for the paved areas. I´ll use styrene sheet for most of the paving again. Some tracks will be paved in and some not.

Thanks for looking. Any coments are very appreciated.

Regards,Chris
Building the BC-Rail Dawson Creek Subdivision in H0 scale http://bigbluetrains.com/forum/viewtopic.php?f=46&t=7835
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)