ISL 2016 - Thinking out loud
#96
Got to thinking about your plan & the problem w/ the short lead on left end. See if this plan works better for your switching ops. That lead could be made longer if the siding switches are moved to the right a little.

   
Andy Jackson
Santa Fe Springs CA
ATSF/LAJ Ry Fan & Modeler
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)