The Hobo Camp Fire Is going well #VII.. Stop In!!!
Don: Not sure what the rules are where you are,
But when I was working, they were building a tower across the street from us, and in raising a panel (or whatever) they smashed the windows on at least the 4 floors our company occupied, well maybe one or two on each floor. Construction company got in trouble because they kept working instead of halting everything until the safety investigators had come around to see.

My weather app today thinks I'm in Sunnyvale, where it's a whole 3 degrees warmer than Guelph.

I knocked my drawer of modelling drills on the floor today. The 61-80 case was open and all but a couple spilled out. Not sure if I found them all because there were gaps in set. I had 2 #75 when I was done!
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.


Messages In This Thread

Forum Jump:


Users browsing this thread: 41 Guest(s)