01-01-2017, 10:51 PM
Well all the track on the left side of the plan is complete up to the red lines. All of the roadbed through Duryea is installed, and just waiting for a order of switches to keep moving forward.
![[Image: Current%2BLayout.JPG]](https://4.bp.blogspot.com/-Jk6WmC4VQLU/WGnbfK4oKXI/AAAAAAAAA18/1XCffGNk95E97-g4Rtg2ljmE6WgprA0yQCLcB/s1600/Current%2BLayout.JPG)
That light at the end of the Tunnel isn't heaven.........ITS A TRAIN!
My Railpictures.net Pictures
My Ramblings and Pictures
My Railpictures.net Pictures
My Ramblings and Pictures
