01-31-2017, 08:00 PM
Had a little time after work today so I started on the rear walkway access. Each railroad did things a little different when it came to how to get from the center cab to the rear deck. I went with what is probably the most common. A single step was added to the firebox front and an altered step ladder on the back end of the walkway.
A little more trimming and fitting and I will be happy here, then it will be time to start the railings.
A little more trimming and fitting and I will be happy here, then it will be time to start the railings.
My other car is a locomotive, ARHS restoration crew
