Interaction Enterprises CPR #2 toolhouse
#2
I got the walls up
[Image: DSCF6942_zpshrfvaikr.jpg]
It's all tab and slot locating on the floor. I stained the floorboards with some of the pine stain I used on the walls.
[Image: DSCF6944_zpsckmkdsqw.jpg]
Then I added the rafters and ridge board.
[Image: DSCF6945_zpswytal1os.jpg]
the two roof pieces are attached, I'm just waiting for the glue to dry before I start shingling.
[Image: DSCF6941_zpsahx0kmyq.jpg]
I also constructed the two doors. They use these laser cut/engraved hinges and lock
[Image: DSCF6943_zpsy75nbvau.jpg]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)