04-13-2009, 09:50 PM
Thanks Jack.
This is the biggest layout I have built, so I think it's going to take a loooong time.
Hi Russ.
Galen was over today and we decided that switching lead needs to go away. It takes to much away from that area. Now to decide if there should be a water feature, a quarry or what. :?
Loren
This is the biggest layout I have built, so I think it's going to take a loooong time.
Hi Russ.
Galen was over today and we decided that switching lead needs to go away. It takes to much away from that area. Now to decide if there should be a water feature, a quarry or what. :?
Loren
I got my first train when I was three,
put a hundred thousand miles on my knees.
put a hundred thousand miles on my knees.
