04-16-2009, 01:08 PM
Nick-the overpass sections are approx 50' long. I needed 4 for my layout.
88-I had the same problem when I did mine.As I mentioned above,I managed to shorten mine. I have the same piers. Measure from the top of the rail to the bottom of the overpass beam to get the height you want.What I ended up doing was to cut the top part of the pier off,figure how much you need to remove and cut the posts to the new length,then re-cement to upper part. I know it sounds confusing but not really. Look at mine in picture 3 and you may be able to tell what I did. If you need more help let me know. Bob
Pete-I had something similar on mine before I removed it in favor of a conveyor system.
88-I had the same problem when I did mine.As I mentioned above,I managed to shorten mine. I have the same piers. Measure from the top of the rail to the bottom of the overpass beam to get the height you want.What I ended up doing was to cut the top part of the pier off,figure how much you need to remove and cut the posts to the new length,then re-cement to upper part. I know it sounds confusing but not really. Look at mine in picture 3 and you may be able to tell what I did. If you need more help let me know. Bob
Pete-I had something similar on mine before I removed it in favor of a conveyor system.
