Larry, there are four outlets to connect hoses to the gray piping system. The track is long enough to have two cars with hoses attached to the pipes. I am inspired by a facility like this US-Systems-Railcar-Unloading-with-Header-1024x768.jpg
A medium gray rattle can session followed by intense dry brushing to get the concrete base color followed by a long grid filing session.
[/url]
[url=https://flic.kr/p/2hwuzLM]
A medium gray rattle can session followed by intense dry brushing to get the concrete base color followed by a long grid filing session.
![[Image: 48915472392_0a38a73b84_c.jpg]](https://live.staticflickr.com/65535/48915472392_0a38a73b84_c.jpg)
[url=https://flic.kr/p/2hwuzLM]
![[Image: 48915472457_cd068de35e_c.jpg]](https://live.staticflickr.com/65535/48915472457_cd068de35e_c.jpg)
Reinhard