01-05-2020, 09:24 PM
Thanks Wayne,
I may have been over simplifying when I said hinge. It was this assembly I was making that took so long. I had to cut, drill and fit it with nothing but the mast and the boom to fit it to. The next 4 or 5 will be easier because I know what to do.
The pulley grooves were easy once I figured them out, and I found 6 suitable round plastic rollers that I can turn for more pulleys, and I also found some small pulleys that came with our friend the Novelty Iron Co. that will work on the auxiliary boom supports.
I did find it to be a very enjoyable day.
Charlie
I may have been over simplifying when I said hinge. It was this assembly I was making that took so long. I had to cut, drill and fit it with nothing but the mast and the boom to fit it to. The next 4 or 5 will be easier because I know what to do.
The pulley grooves were easy once I figured them out, and I found 6 suitable round plastic rollers that I can turn for more pulleys, and I also found some small pulleys that came with our friend the Novelty Iron Co. that will work on the auxiliary boom supports.
I did find it to be a very enjoyable day.
Charlie