East Terminal & Newburgh
#65
Hello,

[Image: dsc01162ttjxc.jpg]
After the electric connections were done, next was ballasting the new track. I use this old spice tin which has rather big bores in their mesh. Ideal for dosed spreading of ballast.
With the aid of the brush the ballast bed was formed and unwanted granules of ballast were sweeped off the ties.
The test truck will tell you the truth if all granules have diappeared from such places were they are unwanted.




[Image: dsc01163fyk5k.jpg]

[Image: dsc011642nkib.jpg]
Then create a mixture of casein glue, water and some drops of cheap dishwasing detergent. The mixture should be a thin low viscosity fluid which is trickled by an pipette genorous onto the ballst bed untill all is soaked thoroughly.
In this case i also began spreading Woodland turf, underbrush and other groundcover devices. They were also soaked with the mixture.
Wait a night long until dry.




[Image: dsc011680rj37.jpg]
Continue the procedure with the groundcover and place some little shrubs strategical.




[Image: dsc0116948je6.jpg]
Dispose the pellet unloading plant and have a look how it appears.
Add a car stop.




[Image: dsc01170jukls.jpg]

[Image: dsc01171aeji2.jpg]
Take another angles of sight and have a look.

For this time i am over with module #4 with the exception for the paint job für the silos still to do.


Lutz









[url=https://abload.de/image.php?img=dsc011642nkib.jpg][/url]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)