Hello,
for now the work on this two Narrow Gauge locomotives is done for now. There is still a lot to do with them, the cab interiors are some if this future tasks. But i have not all of the necessary details (the brass castings) therefor not yet. They have to be ordered in the USA and this can last a while.
And when all these parts were mounted, then the next task is painting and decaling the locos.
As a resumee:
![[Image: dsc04257x3kpa.jpg]](https://abload.de/img/dsc04257x3kpa.jpg)
The T-12 got a full size knuckle coupler as per D&RGW prototype on her forward end.
![[Image: dsc04259lfj3l.jpg]](https://abload.de/img/dsc04259lfj3l.jpg)
![[Image: dsc042613jjzu.jpg]](https://abload.de/img/dsc042613jjzu.jpg)
![[Image: dsc042627cjkl.jpg]](https://abload.de/img/dsc042627cjkl.jpg)
This is as she looks alike now.
![[Image: dsc04263awjgb.jpg]](https://abload.de/img/dsc04263awjgb.jpg)
![[Image: dsc04264b5jtr.jpg]](https://abload.de/img/dsc04264b5jtr.jpg)
And the K-27 too.
Lutz
for now the work on this two Narrow Gauge locomotives is done for now. There is still a lot to do with them, the cab interiors are some if this future tasks. But i have not all of the necessary details (the brass castings) therefor not yet. They have to be ordered in the USA and this can last a while.
And when all these parts were mounted, then the next task is painting and decaling the locos.
As a resumee:
![[Image: dsc04257x3kpa.jpg]](https://abload.de/img/dsc04257x3kpa.jpg)
The T-12 got a full size knuckle coupler as per D&RGW prototype on her forward end.
![[Image: dsc04259lfj3l.jpg]](https://abload.de/img/dsc04259lfj3l.jpg)
![[Image: dsc042613jjzu.jpg]](https://abload.de/img/dsc042613jjzu.jpg)
![[Image: dsc042627cjkl.jpg]](https://abload.de/img/dsc042627cjkl.jpg)
This is as she looks alike now.
![[Image: dsc04263awjgb.jpg]](https://abload.de/img/dsc04263awjgb.jpg)
![[Image: dsc04264b5jtr.jpg]](https://abload.de/img/dsc04264b5jtr.jpg)
And the K-27 too.
Lutz