05-24-2024, 02:03 PM
Good afternoon folks
It has been another hot day here. At 4 PM it 85, our high was 88 and I was watching concrete being poured at that time. I was out in the sun and heat starting at 6:30 this morning until the pour was done at 2 PM.
Over the last few nights, I worked on the bridge area. I weathered the bridges and began gluing down the foam base. I painted the back area where the tunnel portal will go. I also painted the portal.
This is the last weekend before I have a second go at hernia surgery so anything requiring standing and lifting needs to be done. Around the house we have the usual errands to the grocery store, produce store, pharmacy, and pet supply store. We may try to get some flowers from the gardens and a couple of tomato plants and then plant them. Need to get the laundry mountain down some.
On the layout anything requiring standing for a long period of time I need to do. I am working on the bridge area. I have to finish gluing down the foam bases, adding the tunnel portal, painting, adding retaining walls, and the roadway and sidewalks. I want to run some trains and perhaps work on tuning up some rolling stock. I have a bunch of items that need to be entered into my inventory program.
I hope everybody has a good day.
It has been another hot day here. At 4 PM it 85, our high was 88 and I was watching concrete being poured at that time. I was out in the sun and heat starting at 6:30 this morning until the pour was done at 2 PM.
Over the last few nights, I worked on the bridge area. I weathered the bridges and began gluing down the foam base. I painted the back area where the tunnel portal will go. I also painted the portal.
This is the last weekend before I have a second go at hernia surgery so anything requiring standing and lifting needs to be done. Around the house we have the usual errands to the grocery store, produce store, pharmacy, and pet supply store. We may try to get some flowers from the gardens and a couple of tomato plants and then plant them. Need to get the laundry mountain down some.
On the layout anything requiring standing for a long period of time I need to do. I am working on the bridge area. I have to finish gluing down the foam bases, adding the tunnel portal, painting, adding retaining walls, and the roadway and sidewalks. I want to run some trains and perhaps work on tuning up some rolling stock. I have a bunch of items that need to be entered into my inventory program.
I hope everybody has a good day.
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
