06-04-2024, 10:44 PM
In order to determine the amount of shims I need to place under the bridges to reach the track I used double sided tape to attach the track to the thru girder bridge.
![[Image: 3QHCzJ3.jpg]](https://i.imgur.com/3QHCzJ3.jpg)
You can see from below how much is needed.
![[Image: dqBotgg.jpg]](https://i.imgur.com/dqBotgg.jpg)
I used some leftover roadbed material and cardboard to fill in the gap.
![[Image: bfVRr3a.jpg]](https://i.imgur.com/bfVRr3a.jpg)
Now I do the same for the two track bridge.
![[Image: lqwpzPQ.jpg]](https://i.imgur.com/lqwpzPQ.jpg)
I remove the temporary shims and replace with 1/4 inch foam boards.
![[Image: 3zmx6CC.jpg]](https://i.imgur.com/3zmx6CC.jpg)
Trim the foam board to fit.
![[Image: 3QHCzJ3.jpg]](https://i.imgur.com/3QHCzJ3.jpg)
You can see from below how much is needed.
![[Image: dqBotgg.jpg]](https://i.imgur.com/dqBotgg.jpg)
I used some leftover roadbed material and cardboard to fill in the gap.
![[Image: bfVRr3a.jpg]](https://i.imgur.com/bfVRr3a.jpg)
Now I do the same for the two track bridge.
![[Image: lqwpzPQ.jpg]](https://i.imgur.com/lqwpzPQ.jpg)
I remove the temporary shims and replace with 1/4 inch foam boards.
![[Image: 3zmx6CC.jpg]](https://i.imgur.com/3zmx6CC.jpg)
Trim the foam board to fit.
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
