Tmo layout addition '24 build challenge
#18
It's Sunday and I've ascended from shingle hell.  Glued the roofs on the center portion of the elevator and dry fit the silos - ended up sanding down the tops and bottoms of the two tallest silos (by the slightest of margins), and there are still some tweaks needed to get everything sitting level and square.  There is an entry shed that still has to be constructed (it's supposed to go at the back of the structure, but I will probably move it to the front since no one will probably see it in the back) and then each one of the silos gets the aforementioned coal chute for loading trucks, but the major structural items are finished.

   
Check out my "Rainbows in the Gorge" website: http://morristhemoosetm.wixsite.com/rainbows
Reply


Messages In This Thread
Tmo layout addition '24 build challenge - by TMo - 05-31-2024, 04:23 PM
RE: Tmo layout addition '24 build challenge - by TMo - 06-23-2024, 01:36 PM

Forum Jump:


Users browsing this thread: 10 Guest(s)