08-22-2024, 07:45 PM
Finished the 3rd story including the roof and cap and just finished putting a roof (also pulled from the Plant #2 kit) over the loading dock on the 3rd portion of the warehouse. The picture below is the non-show side of the building which will end up fairly close to the back backdrop. As far as building bashing goes, I think I'm about done. It's now time to join all three sections together and pull in a background, but that'll be sometime this weekend I hope.
Check out my "Rainbows in the Gorge" website: http://morristhemoosetm.wixsite.com/rainbows
