09-09-2025, 06:12 PM
The Conrail F7A is now 99% complete. As mentioned before there are a few things that need done but nonetheless it is ready to roll.
Also the Conrail GP35 is 99% finished. The polystyrene was painted black today and this evening the Conrail decal was applied to the front. The grab irons are the only thing left to put on once they dry. If you look closely enough, you can see the patch job on the front but like I said, this locomotive will never be leading so there is no need to worry if the patch job is seen or not.
Also the Conrail GP35 is 99% finished. The polystyrene was painted black today and this evening the Conrail decal was applied to the front. The grab irons are the only thing left to put on once they dry. If you look closely enough, you can see the patch job on the front but like I said, this locomotive will never be leading so there is no need to worry if the patch job is seen or not.
Matt
I can smell a steam post ten blocks away and when I do clear the tracks because the steam express will be hi ballin through
http://cambriaindiana.weebly.com/
I can smell a steam post ten blocks away and when I do clear the tracks because the steam express will be hi ballin through
http://cambriaindiana.weebly.com/