10-21-2025, 05:44 PM
As I said yesterday, the tough part of this build is the front facade and interior details - this one has window glass on the front facade as well as on an interior wall between the front display windows and the back of the store. Those three pieces are laid out in the picture below (the intermediate wall is lower right). Of course, I got a streak of glue on each of the two front display windows, but I'm going with it anyway.
After gluing the display cases in, I found some areas that should really be filled in (like the area below the decking of the display cases), so I'll have to bash those and add them in before finally gluing the intermediate glass wall to the display cases.
If all of that goes well, I'll install the shadow box part of the interior to the intermediate wall and the upper story recessed windows. I expect the signage will have to wait until tomorrow.
After gluing the display cases in, I found some areas that should really be filled in (like the area below the decking of the display cases), so I'll have to bash those and add them in before finally gluing the intermediate glass wall to the display cases.
If all of that goes well, I'll install the shadow box part of the interior to the intermediate wall and the upper story recessed windows. I expect the signage will have to wait until tomorrow.
Check out my "Rainbows in the Gorge" website: http://morristhemoosetm.wixsite.com/rainbows
