06-04-2009, 06:54 PM
I know how to ease into the bottom of a grade by using buisness cards but I am still confused as to how make an easement at the top of the grade! What would be the best method to use at the top of a 2% or 3% grade and approximately how much more length would be needed for the easement if any at all.
Thanks
Leon
Thanks
Leon