12-08-2025, 05:18 PM
Good evening folks
I am still feeling cold from last night. We started at 3 PM and ended around 4:30 AM. For me it was 13.5 hours. For some reason we had a lot of down time. At one point we had to wait nearly an hour for the turnpike to give us a 15 minute shutdown so we could paint the new lanes and move the delineators to direct drivers into the new pattern. We started at 40 degrees and the low was 24 degrees. The cold caused issues with the line paint drying and curing which also added to our time.
We are removing the toll booths, toll plaza buildings and reconfiguring the interchanges. The Turnpike is using Open Road Tolling which are gantries located every so many miles along the East/West Turnpike and Northeast Extension. No tolling at the interchanges. Our project covers Mid County, Norristown (toll plaza building stays), Fort Washington, Willow Grove, Bensalem, and the slip ramps at Virginia Drive and Street Road. There is another contract covering Valley Forge to Reading/Lancaster, and 2 contracts covering all of the Northeast Extension.
We got some of the Christmas decorations for the outside. Testing the lights for the bushes tonight. I think tomorrow night will be a better night to put them out.
I built some rolling kits until I lost a part. Luckily I can order and did order a replacement from Accurail. I did not get a chance to run trains.
I hope everybody has a good evening.
I am still feeling cold from last night. We started at 3 PM and ended around 4:30 AM. For me it was 13.5 hours. For some reason we had a lot of down time. At one point we had to wait nearly an hour for the turnpike to give us a 15 minute shutdown so we could paint the new lanes and move the delineators to direct drivers into the new pattern. We started at 40 degrees and the low was 24 degrees. The cold caused issues with the line paint drying and curing which also added to our time.
(12-07-2025, 08:38 AM)ngauger Wrote: I know it's nuts!! Too much construction going on all at once.. Are you just removing the toll booths and adding EZ Pass?
How many more are there to remove in your area??
We are removing the toll booths, toll plaza buildings and reconfiguring the interchanges. The Turnpike is using Open Road Tolling which are gantries located every so many miles along the East/West Turnpike and Northeast Extension. No tolling at the interchanges. Our project covers Mid County, Norristown (toll plaza building stays), Fort Washington, Willow Grove, Bensalem, and the slip ramps at Virginia Drive and Street Road. There is another contract covering Valley Forge to Reading/Lancaster, and 2 contracts covering all of the Northeast Extension.
We got some of the Christmas decorations for the outside. Testing the lights for the bushes tonight. I think tomorrow night will be a better night to put them out.
I built some rolling kits until I lost a part. Luckily I can order and did order a replacement from Accurail. I did not get a chance to run trains.
I hope everybody has a good evening.
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery