Irgendheim, Germany, 1950
#17
Do you want to talk about wiring yet? You need to think about that before you lay the track so you can provide gaps. What switches -- plastic frogs or rail? I think you plan on DC by the cab wiring you showed. A little bit of playing at the plan level may let you see where you want blocks to end.

I operated one layout where 2 industries were on adjacent sidings. One was the box co., the other seemed to be their biggest customer. Every week I exchanged a car loaded with cardboard boxes for the previous week's empty one. Usually the same 2 cars. hey could have opened the doors, put a plank down, and just trundled the boxes through.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)