05-25-2026, 06:51 AM
A small change of plans. I didn't like how everything was going to be so crowded on the base.
So I added an extra 2" on 2 sides. Now I'll be able to put the water tower with a bit more space and I can also add the finished lumber stack on the end.
I bit of my basic ground cover and the joints dissappear.
I did go with the smaller pieces of roofing. it does look better. I glued the bottom row and am waiting for the glue to dry (aileen's tacky) before adding the second.
I am also working on the water tower but there's not much to show yet.
So I added an extra 2" on 2 sides. Now I'll be able to put the water tower with a bit more space and I can also add the finished lumber stack on the end.
I bit of my basic ground cover and the joints dissappear.
I did go with the smaller pieces of roofing. it does look better. I glued the bottom row and am waiting for the glue to dry (aileen's tacky) before adding the second.
I am also working on the water tower but there's not much to show yet.
