06-04-2026, 10:59 PM
Thanks everyone. I do plan to add logging and sawmill debris all around the mill, just working on some details first.
I have rusted up the roof. I airbrushed two shades of rust and will probably add a bit more. The photos seem to make the rust look lighter than it really is.
As I mentioned before I left the roof off the workshop/ boiler room so you can see into the mill better. I will be adding stacks of cut lumber on the one end, and some loggs to the other.
I have been working on the water tower.
I've started with a cardboard tube, cut about 6 scale inches high, capped on both sides. I painted it black to seal it and I'll be wraping it with stripwood and adding some trestle supports as I go.
I have rusted up the roof. I airbrushed two shades of rust and will probably add a bit more. The photos seem to make the rust look lighter than it really is.
As I mentioned before I left the roof off the workshop/ boiler room so you can see into the mill better. I will be adding stacks of cut lumber on the one end, and some loggs to the other.
I have been working on the water tower.
I've started with a cardboard tube, cut about 6 scale inches high, capped on both sides. I painted it black to seal it and I'll be wraping it with stripwood and adding some trestle supports as I go.
