Irgendheim, Germany, 1950
#19
Benchwork is pretty much finished, except for a reliable way of attaching the two sections as well as some legs. I was thinking of running maybe four screws through the wood holding the two parts together and aligned while still being able to detach the two parts relatively easily. Only worried that the wood may be too soft.

But at least some progress:

The trains run on coal, so we need a coaling station (which from an operating point of view could accept loads of coal coming from off the layout) Flatcar with some scratch-built crates for an idea of scale.
   

The maintenance yard might need a small building for whatever they need a small trackside building for. (a little led is inside)
   
-norm
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)