06-11-2009, 05:46 AM
Well, it has been a while .... looks like I needed a break from working on my layout, but about a week ago the mrr bug bit again. So I already changed the track arrangement on the left side of my layout, because in contrast to my plans when I started this layout, I now think to have a runaround might be nice ... but more on that later.
The last two or three days I spent adding some details, that means bushes, plenty of trash and the first piece of chain-link fence. The fence is scratch built from brass wire and tulle.
Here are some progress shots to get this thread going again.
![[Image: m86.jpg]](http://www.cnw.mattheydesign.de/m86.jpg)
![[Image: m87.jpg]](http://www.cnw.mattheydesign.de/m87.jpg)
![[Image: m88.jpg]](http://www.cnw.mattheydesign.de/m88.jpg)
![[Image: m89.jpg]](http://www.cnw.mattheydesign.de/m89.jpg)
The last two or three days I spent adding some details, that means bushes, plenty of trash and the first piece of chain-link fence. The fence is scratch built from brass wire and tulle.
Here are some progress shots to get this thread going again.
![[Image: m86.jpg]](http://www.cnw.mattheydesign.de/m86.jpg)
![[Image: m87.jpg]](http://www.cnw.mattheydesign.de/m87.jpg)
![[Image: m88.jpg]](http://www.cnw.mattheydesign.de/m88.jpg)
![[Image: m89.jpg]](http://www.cnw.mattheydesign.de/m89.jpg)
![[Image: m90.jpg]](http://www.cnw.mattheydesign.de/m90.jpg)
Kurt