06-12-2009, 03:06 PM
Steps 6-14 were alot of little parts so i assembled them all and then took 2 shots of the end product. Here is a summary of what took place in steps 6-14:
NOTE: there are more steps listed above, in the instructions, some of the steps were combined into one..... lol
![[Image: SL373335.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373335.jpg)
- 1. Glued the Lower Offtake Halves together and into the openings on the top of the Furnace
2. Glued the Bell Platform in place ontop of the Furnace.
3. Bell Platform Supports were glued in place
4. Glued the Mantle Columns in place on the underside of the Mantle Ring
5. Glued the Sheaves onto the Sheave Rod, and then glued this completed assembly into the holes on the tops of the Trolley Support Trusses.
6. Glued the Trolley Support Trusses to the Bell Platform Platform
7. Small Bell Beam and Big Bell Beam were glued in place on the Bell Beam Support and then to the tops of the Trolley Support Trusses
8. The front and rear Trolley Support Braces were glued to the front and the back of the Trolley Support Trusses
9. Then glued the Crane Support Beams in place atop the Trolley Support Trusses
NOTE: there are more steps listed above, in the instructions, some of the steps were combined into one..... lol
![[Image: SL373335.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373335.jpg)
![[Image: SL373336.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373336.jpg)