06-12-2009, 03:13 PM
NOTE, Step 15 has been skipped for now, railings will be installed once this assembly is completely done to eliminate the risk of damaging them when doing more construction on the furnace
Steps 16 and 17 involved gluing together the Upper Offtake Halves, Upper Offtake Elbows, the Downcomer Halves, and the Downcomer End Cap together, gluing the Upper Offtake Halves to the Upper Offtake Elbows at right 90 degree angles. Here is a pic of the Upper Offtake Halves:
Steps 16 and 17 involved gluing together the Upper Offtake Halves, Upper Offtake Elbows, the Downcomer Halves, and the Downcomer End Cap together, gluing the Upper Offtake Halves to the Upper Offtake Elbows at right 90 degree angles. Here is a pic of the Upper Offtake Halves: